烏茲別克斯坦塔什干海螺5000t/d熟料水泥生產(chǎn)線鋼網(wǎng)架工程
發(fā)布日期:2023-04-20 瀏覽次數(shù):894
工程位于烏茲別克斯坦塔什干州阿漢加蘭區(qū)比爾利克村,內(nèi)容包括9200㎡輔料預(yù)均化堆場及輸送長堆網(wǎng)架、9200㎡原煤預(yù)均化堆場及輸送長堆網(wǎng)架、Ф 60m熟料庫網(wǎng)架、Ф 98m石灰石預(yù)均化堆場圓堆網(wǎng)架及輸送熟料儲存及輸送、1794㎡水泥包裝及發(fā)運棧臺鋼網(wǎng)架等子項供貨與安裝。
Space frame of Conch 5000t/d clinker & cement production line , Tashkent Uzbekistan .
The project is located in Billik Village, Ahangaran District, Tashkent Prefecture, Uzbekistan, including the supply and erection of a 9200㎡Common Preblending yard & conveying long stacking grid, 9200㎡of raw coal pre-homogenization yard and conveying long stacking grid, space frame of Ф 60m of clinker silo , Ф98m Stacker & Reclaimer Dome and clinker storage& conveying and 1794 ㎡ packing house & dispatch.